Return to Wildland Fire
Return to Northern Bobwhite site
Return to Working Lands for Wildlife site
Return to Working Lands for Wildlife site
Return to SE Firemap
Return to the Landscape Partnership Literature Gateway Website
return
return to main site

Skip to content. | Skip to navigation

Sections

Personal tools

You are here: Home / Projects / Connecticut River Watershed Pilot / Connecticut River Pilot Core Team / Connecticut River Pilot Core Team Meeting 08-28-2014 / Document: Process and Decisions for Design on the Connecticut River Pilot Project

Document: Process and Decisions for Design on the Connecticut River Pilot Project

This document includes the key decisions made through August 2014 on the Connecticut River Pilot Landscape Conservation Design Project. Where available, details such as the meeting at which we reached consensus, options considered, and associated documents are included.

Publication Date: 2014

DOWNLOAD FILE — PDF document, 102 kB (105,324 bytes)